After setting in the homemade modern concrete segment bridge into the still wet ground goop, I began constructing the mountain. Its largely cardboard framed with plaster impregnated paper towels over top. I used wide masking tape to develop the curves of the mountain. The tunnel portals and retaining walls were attached and then the rock molded plaster castings. Once I was satisfied with it, I began covering it all with the ground goop.
Lots of small details remain, as I need to work the inside of the tunnels so that nothing layout-looking is seen. I will use black construction paper to create the tunnel once I get all the wiring completed.
No comments:
Post a Comment