Task: Elevate tracks using Woodland Scenics foam system


I began probably the hardest part of the layout -- elevation.

However, Woodland Scenics' foam riser and incline foam system makes the process of elevating the tracks much simpler. The downside is the cost. At around $15 per set, and our layout needing probably around 10 sets -- that's big bucks.

I am using the 2% grade set. Its cut so smoothly that it rises from 0" to 4" in 16 running feet at a 2% incline. In one spot, I may have to use a 3% incline set, taking only 12 running feet to go from 0" to 4".

At first I tired to use 1/2" rigid foam board and wood cut to varying sizes to replicate Woodland's system; but, it was a huge failure -- trains derailed, track did not smoothly rise, etc. No wonder Woodland Scenics charges so much. But I want smooth running trains - so we will have to bite the bullet and buy their foam systems.

Lastly, hardboard fascia installation continues. I will modify the already installed pieces as necessary after the elevation of the terrain is completed. The fascia serves several important purposes; it is to prevent curious fingers from playing with track and ground scene, it helps prevent trains crashing to the floor below during an accident, and it provides a smooth eye transition visual. But that being said, it also needs to be as unobtrusive to the eye as possible.

Sunday, May 3, 2009

Task: Work kinks out of track plan

With completion of the rigid foam board top, it was time to work the kinks out of the notional track plan. This is critical prior to the construction of the elevated terrain to support bridge overpassing and smooth operations into and out of corners.

Some of the rolling stock and engines, especially the larger cars and the EMD SD80 need very smooth corners. Also it helps to ensure couplers have free movement in their pockets as they need to give their max sway in the corners. I had one gondola that I had accidentally super glued the coupler along with the pocket cover. It derailed in the corner and I discovered that was the issue upon examination of the problem.

Task: Instal hardboard fascia with DCC system handheld holder and plugin



I began the installation of the hardboard fascia with the first panel being the one with the DCC system hand-held jack. I used 1/8" tempered hardboard cut so that 1 1/2" is below the bench work and the top part roughly follows the planned terrain pattern.